Periodic Tests and Controls

Pressure vessels, lifting equipment, lightning rod, electrical panel controls, grounding, necessary inspection and periodic control programs for obtaining ventilation reports are prepared and maintained by Ceyhan OSGB.

Lifting Tools (every 3 months)

  • Cranes, mobile cranes, forklifts, hoists, Hoists,

Annually – Air tanks, Boilers, steam generators, compressors, boosters, valve tanks, pressure vessels

Annually Electrical installation and grounding, lightning rod, cathodic protection, water pipelines, fuel oil pipelines, natural gas pipelines, above-ground storage tanks